Wednesday, August 15, 2012

Location Wrap

After three grueling days of baking in the small apartment (picture one small room, three + steaming lights, closed windows, and 4-8 sweaty bodies) we were able to call it a location wrap! Last night we had a long break from 6:30 until 9:30 and after some calculating realized that if we were focused and stayed on schedule... and willing to go to 2am... we would be able to complete all of the night scenes.

It was a little slow going, but once we got underway we were able to clip from one shot to the next with no delay. The nice thing about filming at night is that there are fewer sound distractions. Planes fly overheard less often, neighbors, dogs and insects are asleep, no one is mowing, trimming hedges, or drilling outside any of our windows, and we don't have to worry about inconsistent light. The problem with filming that late is that everyone is worn out from a long day as it is and less focused, we have to keep quiet to not disturb neighbors, and everyone gets a little loopy after awhile.

We hunkered through one scene after another, the prospect of calling it early the next night almost in our reach. Soon everyone was covered in a thick layer of sweat, but we had enough energy and focus (ok, we would get off track on occasion) to keep plugging through. As the night progressed and we stayed on or ahead of schedule we realized that our goal was possible. Come 1:50 am I called cut on the last take and we rejoiced briefly before packing up quickly and heading to bed.

The top of Lee Ann's dresser (unfortunately never seen).

Today we only had two scenes to film. They are the most emotional scenes in the film, so I spent a long time going over them with the actors. There was a persistent drilling that would change pitch and varied how long it was on. Sam asked the construction workers with the large truck outside the apartment how long they would be there. Until they found what they were looking for- was the answer. We hoped that was sooner rather than later and set up the first shot. The scene took longer than it would have otherwise, as we had to wait while the loud drilling commenced and scrambled to get each take between breaks. We also had to be wary of airplanes, trucks, and the woman outside the kitchen window who cleaned her car for over five hours. Close to 3pm the drilling ceased and the truck left. Filming went smoothly after this, not having to worry about waiting for the loud noise, and shortly after 5pm we wrapped.

Tomorrow we have quite a few actors on the set, as well as a jumble of locations. It will be tough trying to cram everything in the tight time schedule, but with our extensive planning, things should work out!

No comments:

Post a Comment